Lifting and placing 8-tonne modular units at Shamrock Rovers FC with Procon Modular, using our PALFINGER PK 165.002.

The Challenge

Gallen Crane & Truck Hire has an established working relationship with Procon Modular, providing crane hire and lifting on multiple modular projects. For this one, we were brought on board to install modular units at Shamrock Rovers Football Club, adding facilities to support the club’s ongoing operations.

The Solution

Using our PALFINGER PK 165.002 truck-mounted crane, we lifted and positioned individual modular units weighing approximately 8 tonnes each. Each unit had to be placed carefully onto pre-prepared supporting blocks for accurate positioning and a secure, level foundation.

The Result

With multiple lifts needing precise alignment and controlled placement, our crane and operator played a key role in getting each unit safely into position. It’s great to see our equipment and expertise contributing to recognised sporting venues while continuing our strong partnership with Procon Modular.