Case study

Prefabricated Skid Installation – Ballyragget, Co. Kilkenny

LocationBallyragget, Co. Kilkenny
ServiceLift & Shift
EquipmentPALFINGER truck-mounted crane
StatusCompleted
Summary
Installing prefabricated skids through a single open side and under a low roof at a site in Ballyragget.

The Challenge

We provided specialist lifting for the installation of prefabricated skids at a site in Ballyragget, Co. Kilkenny. Access was limited to one open side of the building, with restricted headroom from the low roof structure.

The Solution

Working within these restrictions called for a considered lifting approach. Crane access, available clearance and the space needed to lower each unit were all planned in advance, with precise movements to guide the skids through the opening and into position beneath the roof.

The Result

The skids were installed safely in their designated positions. A good example of adapting our lifting approach to suit challenging site layouts and restricted access.

Talk to the team

Planning a similar project?

Tell us the brief. We will come back with a lift plan.